Get A Quote
Get A Quote

Blogs

  Generally Safe Work Practices (SWP) are written procedures that outlines how to perform a task with none or minimum risk to people, equipment, materials, environment and processes. But when it comes to driving, the procedures need to be strictly followed since the vehicle accidents can be catastrophic. Safe Driving practices are often found in...
  Flooding due to heavy rainfall, melting of snow, or surface runoff can a big issue for all kinds of properties. Since private property is the responsibility of the owner, City of Edmonton encourages all homeowners to take preventive measures such as lot grading as per grading plan to avoid flooding. In order to prevent...
Concrete works for new houses is usually done by the builders prior to selling house to the homeowner. On the other hand, it is quite intimidating for existing house owners to construct/ renovate old garage pad, driveway and walkway. Selecting an experience and expert contractor is vital for a homeowner for any construction. It is...
As per Alberta Land Surveyors’ Association, Real Property Report (RPR) can be defined as a legal document in the form of plan that clearly illustrates the various physical features of the property and the location of significant visible improvements relative to property boundaries. In simple words, A Real Property Report is a plan that illustrates...
Lot Grading can be considered as one of the very important components of construction. The main purpose of lot grading is to ensure better drainage around the properties so that the owners of these surrounding properties are all benefitted from this. Lot grading can be of two types: Rough Grade includes grading the clay on...
What is Traffic Impact Assessment (TIA)? Traffic Impact Assessment is a report that is prepared to better understand, assess and mitigate any identified traffic and transportation issues associated with the proposed development. How is Traffic Impact Assessment (TIA) Conducted? For Traffic Impact Assessment (TIA), Engineers examine the development area with respect to existing conditions including...
Construction monitoring under the supervision of an engineer is typically required in commercial and industrial building projects. The residential home builders generally do not retain an engineer for construction of residential houses unless the engineer or builder feels the necessity of construction monitoring. The infrastructure needs are different in commercial and industrial buildings than residential...
Tenant improvement commonly refers to the interior changes made within the commercial or industrial property but not the changes made on base building. Tenant improvement can be carried out by the owner or tenant; however, the tenant must pay out the money required for the improvement as per the contract agreement. According to the tenant’s...
What is Infill Development? Most neighborhoods, both older and newer, within city limits have significant number of vacant lands or older structures. Infill development is the process of developing vacant land or land with older structure within existing urban areas to support improved drainage, transportation and various convenience services and amenities. How Infill Development Can...