Rezwana Huq
Director, H&S Administrator | M.Sc, P.Eng
REZWANA is the COMPANY DIRECTOR as well as HEALTH & SAFETY ADMINISTRATOR at MR Engineering Ltd.
She is a Professional Electrical Engineer practicing in Alberta associated with APEGA.
Rezwana has over 8 years of experience in electrical design, engineering, construction support, project management services and health & safety (H&S). Her experience spans across industries of commercial, healthcare, institutional, infrastructure, oil & gas as well as power transmission/distribution & utility system.
Her primary areas of expertise include:
- Design & Engineering of Electrical
- Engineering projects
- Health & Safety Administration
- Client Handling
- Front End Market Exploration
Professional Affiliations
- Professional Engineer registered with APEGA
- Health & Safety Administrator registered with ACSA
- Health & Safety Auditor registered with ACSA
Rezwana’s Philosophy
- Inspired by great leaders across times:
“Again, you can’t connect the dots looking forward; you can only connect them looking backward. So you have to trust that the dots will somehow connect in your future.” [Steve Jobs, Co-founder Apple] - My very Own:
- Success is setting goal each day and having the courage and sweat to put things together
- Giving back always brings on board thousand times more
Fun Facts / Hobbies
- Love to read about great leaders, entrepreneurs and philosophers
- Spending time with my kid and family
What makes her Unique
-
- Passion and energy about exploring new challenges and look-outs
- I am like none
Volunteer or Community Involvement
- Several community event for Bangladesh Canadian Association of Edmonton (BCAE)
- Casino fund raising for Suzuki Charter School
Reference Projects
- Preparing Electrical Scope for double layer Pressure Vessel Platforms funded by SHELL
- Preparing Electrical design and calculation for Fort Chipewyan
- Preparing Electrical design and calculation for a 4 leaf Leduc shop funded by TKCS Innovations Inc
- Installation of a new 12.5 km 260kV Double Circuit transmission line funded by Syncrude Canada Ltd
- Installation of the new 72kV skid mounted substation funded by Syncrude Canada Ltd
- Sulphur Block Removal funded by Syncrude Canada Ltd
- Expansion of 132/11kV, 33/11kV & 11/0.4kV existing substation funded by DESA
- Upgrading of a new 11/6.6kV & 6.6/0.4kV distribution substation funded by DESA